Project Details
Science Park Phases 3a and 3b
Location
Hong Kong
Client
Hong Kong Science and Technology Parks Corporation
Contract Value
HK$2 billion
Construction Period
2012 Q2 - 2013 Q4
The Hong Kong Science Park Phases 3a and 3b project includes the construction of three 8 to 9-storey Research and Development Office and Laboratory Buildings with basement car parks, service tunnels and a link bridge between buildings, covering a construction floor area of 105,000 m2.
Showcasing the latest green construction technologies and sustainable building designs – such as the application and installation of natural ventilation, energy-efficient systems and renewable energy such as photovoltaic – every detail plays its part in the development’s vision of being a green role model for Hong Kong.
Within the project, at least one of the buildings will be targeting the Leadership in Energy and Environmental Design (LEED) Platinum standard, a world recognised green rating system and presently the highest level of certification available. All buildings in the project are targeted to meet the strict Hong Kong Building Environmental Assessment Method (HKBEAM) Plus Platinum standard.
Work on the project would create more than 1,600 jobs in Hong Kong.